It’s Good To Be Back……

The Bathgate Locomotive Works has had its fair share of tribulations over the bleak months.  What with cold temperatures & a leaking workshop roof, production figures have been low to say the least.  At least one job that could be undertaken in the warm ‘Design Office’ were the design & drawings for the boiler for Read more about It’s Good To Be Back……[…]