Week ending 22nd July

Thursday

  -the main effort of the day was dropping and rolling more blaes round the east curve of circuits A and B, the “Newliston circuits”.   A good number of loads were dropped and rolled before the roller failed and had to be carried back to the container area for later examination.  To assist with this work outside edge boards we temporarily installed to level and approximate line as shown in the photos.

              

Meanwhile panel 15 of Circuit B was built up to give 300 feet of track panels ready to join up.  Other tasks accomplished were the fitting of the new security lock to the large container and provisional pegging out among the ferns of the loops for circuit B, not to mention modifications to the rail roller ready for the US Rail.

 

James